Skip to content

Pak Mcqs

Pakistan latest Mcqs with Answers

  • Home
  • English
  • Islamic
  • Computer
  • Science
  • Pak Study
  • Current Affairs
  • Pakistan
  • General Knowledge

what is expected construction cost of barakah power plant in Abu Dhabi?

June 6, 2018 by Saleem Sono
what is expected construction cost of barakah power plant in Abu Dhabi?

A. $20 billion USD
B. $22 billion USD
C. $24.4 billion USD
D. None of above

Related Mcqs:

  • Where is located Barakah power plant which is the world’s largest nuclear project un­der construction ?
    Where is located Barakah power plant which is the…
  • The_________ of war is expected very soon.
    The_________ of war is expected very soon.
  • The field of study concerned with the construction of thought processes, including remembering, problem solving, and decision-making is called?
    The field of study concerned with the construction…
  • branches of biology and medicine concerned with the structure and function of plant and animal cells is called ?
    branches of biology and medicine concerned with the…
  • The act of giving up sovereign power is?
    The act of giving up sovereign power is?
  • One who believes in the power of fate:
    One who believes in the power of fate:
  • In power point ellipse motion is?
    In power point ellipse motion is?
  • In power point ellipse motion is____________?
    In power point ellipse motion is____________?
  • In Power Point Speaker’s information is expressed in?
    In Power Point Speaker’s information is expressed in?
  • All power point slides intance view is?
    All power point slides intance view is?
  • In Power Point Speaker’s information is expressed in___________?
    In Power Point Speaker’s information is expressed…
  • It is certain that human beings ______ latent power of which they are only vaguely aware
    It is certain that human beings ______ latent power…
Categories General Knowledge MCQs
Post navigation
Where is located Barakah power plant which is the world’s largest nuclear project un­der construction ?
According to clause 224 of the Constitution, elections for the national and provincial assemblies are to be held within ______ days following the day the term of the assemblies expires.

Leave a Comment Cancel reply

Pak Mcqs Sections

  • Antonyms Mcqs
  • Biology Mcqs
  • Computer Mcqs
  • English Mcqs
  • Everyday Science Mcqs
  • Fill in the blanks Mcqs
  • General Knowledge MCQs
  • Idioms & Phrases Mcqs
  • Islamic Studies Mcqs
  • One Word Substitutes Mcqs
  • Pair of Words Mcqs
  • Pak Study Mcqs
  • Pakistan Current Affairs MCQs
  • Pakistan MCQs
  • Pedagogy Mcqs
  • Physics Mcqs
  • Quran Mcqs
  • Synonyms Mcqs
  • Uncategorized
  • World Current Affairs MCQs

Related Mcqs

  • Where is located Barakah power plant which is the…
  • The_________ of war is expected very soon.
  • The field of study concerned with the construction…
  • branches of biology and medicine concerned with the…
  • The act of giving up sovereign power is?
  • One who believes in the power of fate:
  • In power point ellipse motion is?
  • In power point ellipse motion is____________?
  • In Power Point Speaker’s information is expressed in?
  • All power point slides intance view is?




© 2021 Pak Mcqs • Built with GeneratePress